The drilling fluid delivery pump developed for special installation requirements is suitable for transporting corrosive drilling fluid with suspended particles or other liquid media in similar working
CNPC news November 20th, in the Turpan Hami oilfield, Yuxi 1-102H well used to drill well to 4251 meters in 39.2 days, and completed well successfully. The drilling cycle was shortened by 53.4% and the penetration rate increased by 251.1%, which refreshed the new record of Yuxi deep heavy oil horizontal well drilling.
The Yuxi 1-102H well is a technical breakthrough well. In the process of drilling, Turpan Hami engineering and Technology Research Institute strengthens technological research and on-site production organization. Through adjusting drilling parameters and optimizing drilling fluid performance, we implement "one well one strategy, one stage and one strategy" as the core technology. In the upper part of the salt layer, soft rock easily reducing section using two-way well tools and supporting technology in horizontal vertical section, using PDC drill bit + high torque screw design for efficient control of oblique pressure composite drilling, in the oblique section with high whipstocking screw sliding drilling.
OGEM's first batch of big sand pump(also called centrifugal pump) is prepred to delivered to users. This time, the sand pump's motor is 90KW. This type of big sand pump is special supply to the mine enterprise to discharge water. This sand pump have a good advantege of slow flow rate,big treating capacity,low pressure and stand wear and tear. centrifugal pump, sand pump,treating capacity big sand pump If you have requirement, welcome to contact us. Contact email: ogem@ogemsolidscontrol.com
RuiLin Hydrocyclone desander is used after the shale shaker or mud cleaner as the third phase solids control equipment in the drilling ring's mud system. CSQ Desander separator is 2nd phase mud process equipment in solids control system.
The cones size and number can be adjusted according to client's actual capacity requirements.
Cones also can be cast iron or other materials. The bottom shaker can be configured or not.
We also can design desander with large bottom shale shaker, such as RLS703L, RLS603L etc. RLCSQ seriesHydrocyclone desander is 2nd solids control equipment.
RuiLin desander is widely used in oil and gas drilling, HDD, slurry separation, etc. Industry.