Copyright(C)Tangshan Ruilin Technology Co.,Ltd 冀ICP备20017114号-1 Powerd by 300.cn
Add: HouYujiadian Village Yuehe Town Kaiping District Tangshan City Hebei E-mail:ogem@ogemsolidscontrol.com Tel:86-315-2648088
Collection
SOLVE PROGRAMME
——
PRODUCTS
Solid Control Equipment
Well Control Equipment
Solid Control Accessories
Solid Control System
Waste Mud Treatment Equipment
Auger Conveyors
Centrifugal Pumps
Desilters
Drilling waste system
Flare Ignition Devices
Gas-liquid Separator
Particle Impact System
shale shaker type screen
Desilter Hydrocyclones
Mud Cleaner system
Drilling Fluid Shale Shaker
Submersible Slurry Pump
Hydrocyclone Desander
FLC500 Flate Plate Shaker Screens
TBM and Bored Pile Desanding Plant
Vertical Degasser:Vertical DegasserRuiLin Vertical Degasser (RL Solids Control Vaccum Degasser)
RLZCQ series vacuum degasser/ gas buster is a special equipment to get rid of invaded gas. It can separate various gas in drilling fluid. Meanwhile, it will recover mud weight efficiently. Keep drilling fluid propetry steady. In the solids control system, the vacuum degasser is after the shale shaker.
Features
1. Compact design
2. High performance/full vacuum
3. Vacuum pump mounted together with degasser vessel
4. Internal impellers
5. Vertically-mounted units
6. Without feed pump
Technique parameters of Drilling Fluid Vacuum Degasser
Model |
RLZCQ240 |
RLZCQ270 |
RLZCQ300 |
RLZCQ360 |
Vessel diameter |
700mm |
800mm |
900mm |
1000mm |
Treating capacity |
≤240 m3/h |
≤270 m3/h |
≤300 m3/h |
≤360 m3/h |
Vacuum pressure |
-0.030~-0.045MPa |
-0.030~-0.050MPa |
-0.030~-0.055MPa |
-0.040~-0.065MPa |
Ratio |
1.68 |
1.68 |
1.68 |
1.72 |
Efficiency |
≥95% |
≥95% |
≥95% |
≥95% |
Main motor |
15KW |
22KW |
30KW |
37KW |
Vacuum pump motor |
2.2KW |
3KW |
4KW |
5.5KW |
Impeller speed |
860RPM |
870RPM |
876RPM |
880RPM |
Dimension |
1750×860×1500mm |
2000×1000×1670mm |
2250×1330×1650mm |
2400×1500×1850mm |
Weight |
1100kg |
1350kg |
1650kg |
1800kg |
Benefits of drilling fluid vacuum degasser
1. The material is SS304, so can be used long time.
2. We do the balance test before delivery, it has good performance of low noise.
3. The drilling mud is mixed evenly, so do not easy to bring bubbles.