Solids Control

Solids Control

current location:
Homepage
/
/
Two Lian Oilfield: Dredge card blocking, sealing water, flooding

Two Lian Oilfield: Dredge card blocking, sealing water, flooding

Views:
China Petroleum network news, Huabei Oilfield two branch for high production liquid, high water well plugging water measures, as of August 25th, 29 wells have been selected to implement plugging water production measures.   According to the remaining oil distribution of the two branch company, the water flooded plane and water flooded horizon can be found out accurately. For the watered out layer with high yield, the layer is blocked by the lower packer; and the channel is blocked by injecting chemical plugging agent in the high water flooded channel of thick reservoir. Through these measures, the water production is restricted, and the purpose of eliminating the high water cut source from the well network and improving the effect of oilfield development is achieved.   In the aspect of technology, even the two branch adhere to the principle of a well - a method, combined with the crude oil physical characteristics, the water plugging technology of mechanical and chemical application card water flow direction, control the flow of water in the aquifer and change the water flooding water, improve water flooding efficiency.   In order to improve the mechanical measures of water effect, even two branch through wells, test set and other measures to implement the wellbore, and the bridge plugging plugging effect after verification, to ensure bridge sealing success fonseca. In addition, aiming at the blocking water of some casing wells, the plug with small diameter bridge plug is introduced and used to maximize the water plugging measures.   In order to improve the construction of water blocking in chemistry, technical personnel to fully optimize the construction process by using sand filling, top seal and other measures to ensure refined water plugging layer, water flooded layer can inject water plugging agent, and other production layer is not blocked agent pollution. During construction, the technicians monitor the injection pressure and lift up the situation to ensure sufficient plugging agent and effectively seal the water flooded layer.   Relevant content:OGEM petroleum solid control equipment has always been the credibility and quality as the cornerstone of development, in the staff of the full implementation of "unity, innovation, truth-seeking, integrity" business purposes. Provide high quality service, high quality products, is always Tangshan OGEM solid control the pursuit of forever! We would like the basis of equality and mutual benefit with all the friends sincere cooperation and seek common development! Welcome more business consulting: 0315-2648099 Fax: 0315-2648066!
这是描述信息

Solids Control

这是描述信息

ADD:East Tangqian Road, Kaiping District, Tangshan City, Hebei Province

这是描述信息

TEL:+86-0315-2648088

这是描述信息

E-MAIL:sales@ajgukong.com

Powered by: